Product Costing

Can R&D be tracked in DBA?
DBA does not have a module for tracking R&D.  R&D should never be run through the Jobs module because of the accounting implications (Jobs are for i...
Wed, 4 Oct, 2017 at 12:36 PM
How do I backdate into a prior accounting period?
Backdating to a Prior Period There may be occasions shortly after the end of a period when you may want to backdate a new transaction into the prior per...
Tue, 16 Feb, 2021 at 11:34 AM
What can cause the Job Estimated Cost to differ from BOM Rolled Up Estimated Cost?
Differences between Job Estimated Cost and Estimated Cost (from Cost Rollup) Overview:  Manufactured (M) items estimated costs are established using the...
Mon, 9 Oct, 2017 at 11:08 AM
Can I run the WIP Value report as of a date in the past?
Can I run the WIP Value report as of a date in the past? The WIP Value report can only be ran as of today's date.  This is by system design.   T...
Mon, 9 Oct, 2017 at 11:11 AM
WIP Value report: How is Material cost calculated?
WIP Value report: How is Material cost calculated? The 'Material' column on the WIP Value report represents the cost of the material that has be...
Mon, 9 Oct, 2017 at 11:17 AM
How to fix a PO Receipt cost that was entered incorrectly
How to fix a PO Receipt cost that was entered incorrectly It's very difficult to fix historical cost transactions that have already occurred and hav...
Mon, 9 Oct, 2017 at 11:48 AM
When a PO Invoice detail line is matched for less/more cost than the PO Receipt was processed for, how does the system handle this cost variance?
When a PO Invoice detail line is matched for less/more cost than the PO Receipt was processed for, how does the system handle this cost variance? Occasio...
Mon, 9 Oct, 2017 at 12:02 PM